WWT International Inc. 3-3/8-Inch Coiled Tubing Tractor Facilitates Well Cleanout and Bridge Plug Removal
Problem: Operator tried unsuccessfully with competing tractors to perform well cleanout and remove composite bridge plugs to achieve target depth.
Solution: The WWT International CT Tractor was used successfully to convey the coiled tubing beyond lock-up, perform a balldrop and open up a circulation port at TD, and enable milling of composite bridge plugs left over from fracing operations.