Skip to main content Skip to footer
Search

Case Histories

WWT Non-Rotating Protectors Reduce Torque in Challenging Well

Location: North America
Well Type: Horizontal
Objective: Torque Reduction
Solution: WWT NRPs
Results: Reduced torque more than 25% @ TD

WWT NRP Case History Horizontal Torque Reduction 7639

WWT Non-Rotating Protectors Reduce Torque in Directional Well

Location: North America
Well Type: Directional
Objective: Torque Reduction
Solution: WWT NRPs
Results: Immediate 32% torque reduction upon installation of WWT NRPs

WWT NRP Case History Directional NAM 7166

WWT Non-Rotating Protectors Reduce Torque in Directional Well Europe

Location: Continental Europe
Well Type: Directional
Objective: Torque Reduction
Solution: WWT NRPs
Results: Immediate torque reduction upon installation of WWT NRPs.

WWT NRP Case History Directional Europe 7525

WWT NRPs Reduce Torque 34% with in a Long Horizontal Well

Location: Middle East
Well Type: Horizontal
Objective: Torque Reduction
Solution: WWT SS3-550 NRPs
Results: 34% Torque Reduction

WWT NRP Case History Horizontal Middle East 7920

Conveyance of Coiled Tubing Tool Strings

Sakhalin Island, Russia
Job: 0401
Well Depth:     9,300 meters + TMD
2,600 meters + TVD
Problem: The conveyance of tool stings carrying perforating guns and production logging instruments to TMD beyond that of the coiled tubing helical lock-up point.
Solution: The WWT International Inc. Intervention Tractor, developing 8,500 lbs. of force and installed at the end of the coiled tubing, was able to deliver tool strings to the desired location on 5 runs into the well, accumulating over 4,300 meters of walking distance at up to 17 ft. per minute.

WWT International Inc. 3-3/8-Inch Coiled Tubing Tractor Facilitates Well Cleanout and Bridge Plug Removal

Problem:  Operator tried unsuccessfully with competing tractors to perform well cleanout and remove composite bridge plugs to achieve target depth.
Solution: The WWT International CT Tractor was used successfully to convey the coiled tubing beyond lock-up, perform a balldrop and open up a circulation port at TD, and enable milling of composite bridge plugs left over from fracing operations.

Well Cleanout
.